1 Commits

Author SHA1 Message Date
1ad9b8af1d Add Phase 7 plan: Production UI with i18n, themes, OAuth, blueprint parity
Some checks failed
Validate / Hassfest (push) Has been cancelled
Phase 7 covers:
- i18n (RU/EN), dark/light themes, OAuth via Immich
- 4 notification modes matching HAOS blueprint
- Enhanced tracker config (filtering, sorting, telegram media)
- Full template variable system (40+ vars, per-event templates)

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-19 15:31:02 +03:00