Files
haos-hacs-immich-album-watcher/plans
alexei.dolgolyov 1ad9b8af1d
Some checks failed
Validate / Hassfest (push) Has been cancelled
Add Phase 7 plan: Production UI with i18n, themes, OAuth, blueprint parity
Phase 7 covers:
- i18n (RU/EN), dark/light themes, OAuth via Immich
- 4 notification modes matching HAOS blueprint
- Enhanced tracker config (filtering, sorting, telegram media)
- Full template variable system (40+ vars, per-event templates)

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-19 15:31:02 +03:00
..

Plans

This folder contains the primary architecture plan and phase-specific subplans for the Immich Watcher project restructuring.

Structure

  • primary-plan.md -- Master plan with architecture decisions and phase overview
  • phase-1-core-library.md -- Extract shared core library
  • phase-2-haos-refactor.md -- Wire core into HAOS integration
  • phase-3-server-backend.md -- Build standalone FastAPI server
  • phase-4-frontend.md -- Build SvelteKit web UI
  • phase-5-haos-server-sync.md -- Optional HAOS-Server integration

Tracking

Each plan uses checkbox tracking:

  • [ ] -- Not started
  • [x] -- Completed
  • [~] -- In progress
  • [-] -- Skipped/deferred

Phase subplans are created when work on that phase begins (not all upfront).