Commit Graph

3 Commits

Author SHA1 Message Date
alexei.dolgolyov 652229c67f chore: fix build dependencies and frontend config
Migrate Docker SDK from github.com/docker/docker (+incompatible)
to github.com/moby/moby/client v0.3.0 + moby/moby/api v1.54.0
(proper Go modules). Adapt all container/image/network operations
to the new moby API (Filters, ContainerListOptions, PullResponse,
InspectResult, etc.). Add AsyncTriggerDeploy runDeploy method.

Fix SvelteKit build: disable prerender, set strict=false for SPA,
bump vite-plugin-svelte to v5 for vite 6 compat.

Add .dockerignore to exclude .git, node_modules, plans.
2026-03-28 13:13:45 +03:00
alexei.dolgolyov f0b52c6ab7 chore: fix build dependencies and frontend config
- Bump Docker SDK, downgrade otel deps for Go 1.24 compatibility
- Fix duplicate i18n import in InstanceCard
- Fix SvelteKit prerender/strict config for SPA build
- Update Dockerfile with GOTOOLCHAIN=auto
- Generate package-lock.json and go.sum

WIP: still resolving Go 1.24 vs otel transitive dep versions
2026-03-28 00:38:18 +03:00
alexei.dolgolyov 32de5b26a8 feat(docker-watcher): phase 12 - hardening
Blue-green zero-downtime deploys, promote flow validation.
Dual auth: local (bcrypt + JWT) and OAuth2/OIDC (any provider).
Auth middleware, login page, auth settings UI.
Structured logging (slog JSON), config export to YAML.
Graceful shutdown with deploy draining.
Multi-stage Dockerfile and production docker-compose.yml.
Swap phase order: Volumes & Env before UI Polish.
2026-03-27 23:20:56 +03:00